Brinklow Quarry, near Rugby, which is part of a large and diversified farm, approached us to resolve some problems with the distribution of energy from an 800kW wood-chip boiler.
Some sections of the original underground pipework was steel wrapped in an oily tape. It wasn’t going to last and it wasn’t at all efficient. We replaced it with an insulated set of pipes, designed to be buried, with electro-fusion-welded joints, properly encased in insulation and a hard shell.
We added a bespoke control system (from MotorControlWarehouse) to run the boiler and pumps. Because the boiler has a very large jacket, we eliminated the buffer tank from the picture, to reduce energy losses.