For Hendre Aled, a holiday rental complex in Llansannan, we installed two large ground arrays to run three ground-source heat pumps (from Kensa Engineering), which provide the space heating and hot water for a farmhouse and four adjoining cottages.
The ground arrays and the header pipework involve hundreds of metres of buried pipe, so the integrity of the joints is crucial. Electro-fusion welding is the best option for this application. The welding process is reliable if the preparation is good, and always feels controlled.
Preparation is even more important when you’re handling a big coil of 90mm HDPE, which we used for the larger sections of header pipework. It takes straps, a sensible team and a competent digger driver.

Careful planning is critical, particularly when you are going to be digging large trenches to run the ground arrays.



The path of the ground arrays was marked out and then dug. The slinkies were then placed in the trenches and connected to a manifold.
The manifold functions as a control and monitoring point. It manages the flow and pressure of the fluid that circulates between through the ground arrays and the heat pump.

Careful planning was also important when designing how the three pumps would work together.
The control panel was neatly laid out to allow ease of use.