We designed and installed a new boiler and heating system at the offices of InSite Technical in Cleddau Bridge. InSite provides design and project management services to the oil, gas and nuclear industries.
At the point of commissioning Gwres Glas, we had to address two main concerns expressed by InSite’s directors: the system has to be robust, as it shares the floor void with kilometers of data and power cabling, and it had to be delivered so they could move their expanding staff into the new offices before the old lease expired.


To answer the first concern, a combination of Aquatherm plastic pipes (heat welded) was used for the large pipes and high-quality pushfit Pegler plastic pipes for the distribution pipework in each wing. In order to ensure smooth and punctual work, a lot of time was spent designing a detailed work plan. Long before the start of the project, the size of the pipes and pumps was decided, but also details such as the specific location of the pipe clamps on the wooden structure of the building.
The design was detailed, running from pump and pipe sizes right down to the pipe-clamp mounting studs. InSite considered wood pellets as a fuel, but settled on LPG. The boilers (2x80kW Buderus) heat a buffer (from TML), with energy distributed through a manifold (from Lovato). The pumps, boilers and weather-compensating blending valves (LK, for each of five zones) are controlled centrally by a fairly sophisticated unit (from Solar Focus), which is easy to set up. Our normal partners were involved in the work, as well as some new people from the Pembrokeshire area, found through local recommendations.
There were some moments of creative tension, but InSite moved in on time without any issues.